BBR Project of 2009

Kampong Pandan Flyover, Kuala Lumpur honored

Yok-Lin Voon, representing BBR Construction Systems, traveled home to Malaysia - from the Global BBR Conference 2009 in Paris - carrying the prestigious BBR Project of the Year Award 2009 – which was presented in recognition of the company’s work on the Kampong Pandan Flyover in Kuala Lumpur.
The highly complex 12-span, 568 m long highway flyover scheme connects the busy commercial area at Jalan Sultan Ismail with the housing area of Jalan Kampong Pandan.
To eliminate interface risks with two other projects in progress, a design based on balanced cantilever construction using form travelers was adopted. BBR CONA tendons were installed for the spans and cantilever to build the structure in an efficient and timely manner without any interruptions to busy traffic flows.

20.04.2009